We are almost there! We made a strong "push" this week to move-in. Right now, we are simply waiting for the Fire Inspection to take place right after we install all the fire-related system for the building. We are scheduled to have all the system installed by Tuesday afternoon. The walls are up, taped, textured and painted! Doors are installed and locks will be rekeyed on Monday. Only the exterior paint will be delayed at this point. Stay tuned as we hope and pray that we will be able to move in within the week!